EWE HYDROGEN GmbH and VERBUND GREEN HYDROGEN GmbH intend to establish and operate a modular 200 MW electrolysis plant as part of a joint venture. Operating at around 5.000 full-load hours, the plant can produce up to 17.600 t/a of green H2 from renewable electricity (RED II) and feed it into the H2Coastlink 5 pipeline. This tender covers the prequalification for the upcoming EPC-tender.